Projects

Container Handling Cranes – Sing Swee Bee Enterprise Pte Ltd (2024)

Engineered Container Lifting Solutions

Container handling operations require high-capacity, stable, and precisely controlled lifting systems to safely manage heavy containers while maintaining alignment, load stability, and operational efficiency within limited yard and plant spaces.

In 2024, Helmsion Engineering successfully delivered engineered container handling crane solutions for Sing Swee Bee Enterprise Pte Ltd, supporting operations at their Singapore facility and Malaysia plant.

Engineered Scope of Supply

Helmsion Engineering was responsible for the design, supply, and delivery of the following systems:

  • Overhead Crane System complete with Container Handling System for the Singapore facility, engineered for safe, efficient, and controlled container lifting operations
  • Gantry Crane complete with Container Handling Spreader for the Malaysia plant, designed to ensure secure load engagement, balanced lifting, and precise container positioning
  • PLC-Based Crane Control System, incorporating multiple programmable positioning settings to achieve accurate, repeatable movements, improved operational efficiency, and enhanced safety


Why These Systems Are Critical for Container Handling

Container handling involves heavy loads, repetitive lifting cycles, and strict positioning accuracy requirements. The integration of container handling systems and PLC-controlled positioning enables stable lifting, consistent load placement, reduced operator dependency, and improved overall operational safety.

Technical Excellence, Safety & Compliance

The crane systems were designed to suit site-specific operational requirements such as container weight, lifting height, duty cycle, and plant layout, ensuring smooth container movement, reduced handling time, and improved overall efficiency. Both systems deliver reliable lifting performance, precise load control, and enhanced operational safety, while minimising manual intervention and handling risks.

Project Outcome

The successful execution of this project demonstrates Helmsion Engineering’s capability to deliver customised, intelligent, and high-performance container handling crane solutions across multiple locations, with consistent engineering quality and compliance.